{"id":940,"date":"2025-09-11T11:44:25","date_gmt":"2025-09-11T09:44:25","guid":{"rendered":"https:\/\/prodengrup.com\/gestio-dobres-sense-projecte\/"},"modified":"2025-09-15T16:38:49","modified_gmt":"2025-09-15T14:38:49","slug":"gestio-dobres-sense-projecte","status":"publish","type":"post","link":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/","title":{"rendered":"Gesti\u00f3 d&#8217;obres sense projecte"},"content":{"rendered":"\n<p><strong>Qu\u00e8 \u00e9s una obra de construcci\u00f3? tota obra de construcci\u00f3 ha de tenir projecte?   <\/strong>Si no teniu projecte, no teniu direcci\u00f3 facultativa, per\u00f2 <strong>heu de tenir coordinador de seguretat?<\/strong><\/p>\n\n<p>Aquests s\u00f3n alguns dels dubtes habituals que apareixen, quan l&#8217;obra no est\u00e0 definida i\/o dissenyada segons els <strong>est\u00e0ndards m\u00e9s habituals contemplats al RD1627\/97.<\/strong><\/p>\n\n<p>La definici\u00f3 del concepte d&#8217;una obra no \u00e9s f\u00e0cil de definir de manera clara i concisa all\u00f2 que pot portar a diferents interpretacions.<\/p>\n\n<p>El <strong>Reial decret 1627\/1997<\/strong> defineix obra de construcci\u00f3 com:<\/p>\n\n<p><em>qualsevol obra, p\u00fablica o privada, en qu\u00e8 s&#8217;efectu\u00efn treballs de construcci\u00f3 o enginyeria civil la relaci\u00f3 dels quals no exhaustiva figura a l&#8217;annex<\/em> <em>I<\/em><\/p>\n\n<p>Una altra definici\u00f3 d&#8217;obra de construcci\u00f3 \u00e9s la que est\u00e0 contemplada a la <strong>Llei 32\/06 reguladora de la subcontractaci\u00f3 al Sector de la Construcci\u00f3<\/strong> que inclou qualsevol dels treballs que s&#8217;enumeren a continuaci\u00f3:<\/p>\n\n<p><em>\"<\/em> <em>Excavaci\u00f3, moviment de terres, construcci\u00f3, muntatge i desmuntatge d&#8217;elements prefabricats, condicionaments o instal\u00b7lacions, transformaci\u00f3, rehabilitaci\u00f3, reparaci\u00f3, desmantellament, enderrocament, manteniment, conservaci\u00f3 i treballs de pintura i neteja, sanejament.\"<\/em><\/p>\n\n<p>A m\u00e9s de comprovar si la nostra activitat es troba dins l&#8217; <strong>annex I<\/strong> del <strong>Reial decret 1627\/97<\/strong> o concorda amb les definicions del Reial decret esmentat o de la <strong>Llei 32\/06<\/strong> de subcontractaci\u00f3, \u00e9s recomanable analitzar, en conjunt, si es presenten les circumst\u00e0ncies seg\u00fcents.<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Els treballs tenen un car\u00e0cter temporal i el lloc de treball evoluciona de manera permanent en funci\u00f3 del temps<\/li>\n\n\n\n<li>L&#8217;empresa que executa els treballs est\u00e0 inclosa a la secci\u00f3 F, apartats 41 a 43, del CNAE<\/li>\n\n\n\n<li>Els treballs s&#8217;executen amb tecnologies pr\u00f2pies de la ind\u00fastria de la construcci\u00f3.<\/li>\n<\/ul>\n\n<p>En el cas que els treballs siguin considerats obra de construcci\u00f3 segons all\u00f2 esmentat als tres punts anteriors haur\u00e0 de complir el <strong>RD1627\/97<\/strong> en cas contrari aplicarem el <strong>RD171\/04 per poder realitzar la CAE<\/strong> (Coordinaci\u00f3 d&#8217;Activitats Empresarials )<\/p>\n\n<p>Davant del <strong>dubte de la necessitat de coordinador de seguretat,<\/strong> encara sense direcci\u00f3 facultativa ni projecte, el promotor de l&#8217;obra designar\u00e0 el coordinador de seguretat i salut durant l&#8217;execuci\u00f3 de l&#8217;obra <strong>sempre que hi intervinguin m\u00e9s d&#8217;una empresa<\/strong> , o una empresa i treballadors aut\u00f2noms o diversos treballadors aut\u00f2noms. Per tant, la <strong>designaci\u00f3 d&#8217;un coordinador<\/strong> no dep\u00e8n de la magnitud, exist\u00e8ncia de projecte, volum ni durada de l&#8217;obra. <\/p>\n\n<p>En definitiva, es considera obra de construcci\u00f3, d&#8217;acord amb all\u00f2 establert al <strong>RD 1627\/1997<\/strong> i la <strong>Llei 32\/2006<\/strong> , i\/o quan concorren determinades condicions <strong>com<\/strong> el <strong>car\u00e0cter temporal dels treballs<\/strong> , l&#8217; <strong>evoluci\u00f3 del lloc de treball<\/strong> , l&#8217;\u00fas de <strong>tecnologies pr\u00f2pies del sector<\/strong> i la <strong>pertinen\u00e7a de l&#8217;empresa<\/strong> a la secci\u00f3 F (41 a 43); en aquests casos s&#8217;ha d&#8217;aplicar el <strong>RD 1627\/1997<\/strong> i, encara que no hi hagi projecte ni direcci\u00f3 facultativa, el promotor est\u00e0 obligat a designar un coordinador de seguretat i salut si <strong>hi intervenen diverses empreses, aut\u00f2noms o una combinaci\u00f3 de tots dos.<\/strong><\/p>\n\n<p>D&#8217;altra banda, quan una obra es realitza en un <strong>centre de treball on es realitza una activitat<\/strong> s&#8217;ha de recopilar la informaci\u00f3 rellevant sobre els riscos.<\/p>\n\n<p>At\u00e8s que el <strong>promotor<\/strong> \u00e9s el que coneix millor el lloc on s&#8217;executar\u00e0 l&#8217;obra, ha de demanar informaci\u00f3 sobre les caracter\u00edstiques de l&#8217;empla\u00e7ament i la concurr\u00e8ncia de diferents empreses i treballadors aut\u00f2noms aliens a l&#8217;obra que es puguin trobar en aquest empla\u00e7ament.<\/p>\n\n<p>Amb la finalitat d&#8217;integrar totes les mesures preventives en el proc\u00e9s constructiu, les empreses a qu\u00e8 se&#8217;ls ha encarregat l&#8217;execuci\u00f3 de l&#8217;obra, considerant la informaci\u00f3 recopilada pel promotor, incorporaran les mesures preventives oportunes als seus procediments de treball.<\/p>\n\n<p>A les <strong>obres sense projecte<\/strong> , en abs\u00e8ncia de <strong>Pla de seguretat i salut<\/strong> <strong>*<\/strong> ( <em>document derivat de l&#8217;estudi de seguretat del projecte<\/em> ), el conjunt d&#8217;aquests procediments de treball formar\u00e0, essencialment, un \u201c <strong>document de gesti\u00f3 preventiva de l&#8217;obra\u201d (DGPO)<\/strong> el qual ser\u00e0 elaborat pel contractista de l&#8217;obra en cooperaci\u00f3 amb les empreses subcontractistes i treballadors aut\u00f2noms.<\/p>\n\n<pre class=\"wp-block-verse\"><strong><em>* En abs\u00e8ncia d'Estudi de Seguretat i Salut (que forma part del projecte) en qu\u00e8 basar-se per redactar el PSS, s'elaborar\u00e0 un DGPO<\/em><\/strong><\/pre>\n\n<p>El <strong>document de gesti\u00f3 preventiva de l&#8217;obra<\/strong> ha de ser un document <strong>realista<\/strong> (ha de reflectir la de l&#8217;obra i de l&#8217;entorn on es realitza), espec\u00edfic (centrant-se \u00fanicament en els riscos i les mesures associats a les activitats que efectivament s&#8217;executaran) i <strong>pr\u00e0ctic<\/strong> (\u00e9s el document de refer\u00e8ncia i de consulta per posar en pr\u00e0ctica les mesures preventives previstes).<\/p>\n\n<p>Aquest document de gesti\u00f3 preventiva de l&#8217;obra, <strong>no subjecte als tr\u00e0mits formals d&#8217;aprovaci\u00f3<\/strong> establerts en el cas del Pla de seguretat i salut, ser\u00e0 supervisat pel promotor (per mitj\u00e0 del t\u00e8cnic competent que correspongui) (en aquest cas entenem que hauria de ser el Coordinador de Seguretat i Salut per exercir de manera efectiva les funcions que reglament\u00e0riament t\u00e9 assignades.)<\/p>\n\n<p>Des del 2010 fins fa uns anys, valia que l&#8217;empresa Contractista aport\u00e9s l&#8217; <strong>Avaluaci\u00f3 de Riscos<\/strong> (de les execucions, maquin\u00e0ria i mitjans auxiliars; que la podia aconseguir del Servei de Prevenci\u00f3) per tramitar l&#8217;Obertura del Centre de Treball.<\/p>\n\n<p>I encara que la normativa que aix\u00ed ho indica encara segueix vigent (Ordre TIN\/1071\/2010), entenem que cal aportar un document m\u00e9s adaptat pr\u00e0ctic i realista, en col\u00b7laboraci\u00f3 igualment amb el Servei de prevenci\u00f3 del contractista, que justifiqui una planificaci\u00f3 preventiva en el seu conjunt per a l&#8217;obra concreta que es tracti. Aquest document s&#8217;anomenaria DGPO i inclouria la major part del contingut exigible a un Pla de Seguretat i Salut. <\/p>\n\n<p>Per aix\u00f2, l&#8217;INSST, va publicar ja el 2015 les \u201cDirectrius B\u00e0siques per a la integraci\u00f3 de la prevenci\u00f3 de riscos laborals a les obres de construcci\u00f3\u201d, en el contingut de les quals s&#8217;indica la conveni\u00e8ncia d&#8217;elaborar el <strong>Document de Gesti\u00f3 Preventiva de l&#8217;Obra<\/strong> , per al cas d&#8217; <strong>obres sense Projecte.<\/strong><\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Coordinaci\u00f3 amb el centre de treball en funcionament<\/strong><\/h2>\n\n<p>En aquests casos, a l&#8217;hora de planificar els treballs, cal preveure una <strong>doble coordinaci\u00f3:<\/strong> coordinaci\u00f3 de les activitats dins de la pr\u00f2pia obra d&#8217;acord amb el que indica el <strong>Reial decret 1627\/1997<\/strong> ; i coordinaci\u00f3 entre les activitats de l&#8217;obra en si i les activitats que es realitzen al centre de treball conforme al <strong>Reial Decret 171\/2004<\/strong> .<\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Aplicaci\u00f3 de la llei de subcontractaci\u00f3 en obres sense projecte<\/strong><\/h2>\n\n<p>Entenem que la <strong>Llei 32\/2006 de Subcontractaci\u00f3<\/strong> s&#8217;aplica a totes les obres de construcci\u00f3 incloses en el seu \u00e0mbit, fins i tot quan no existeixi projecte, sempre que els treballs realitzats estiguin compresos a l&#8217;article 2 i es portin a terme per empreses del sector o subcontractistes en cadena.<\/p>\n\n<p>L&#8217;exist\u00e8ncia de projecte no condiciona l&#8217;aplicaci\u00f3 de la <strong>Llei 32\/2006<\/strong> de subcontractaci\u00f3, sin\u00f3 que aquesta dep\u00e8n de la naturalesa dels treballs realitzats i de l&#8217;estructura de contractaci\u00f3 entre empreses i subcontractistes<\/p>\n\n<p>Per tant, en el cas d&#8217;obres sense projecte haurem de complir la <strong>Llei 32\/2006<\/strong> i el <strong>Reial decret 1109\/2007<\/strong> .<\/p>\n\n<p>Per aix\u00f2 :<\/p>\n\n<ul class=\"wp-block-list\">\n<li>No podrem <strong>subcontractar la totalitat<\/strong> d\u201fun enc\u00e0rrec, ja que aix\u00f2 suposaria una mera intermediaci\u00f3.<\/li>\n\n\n\n<li>L&#8217;empresa que subcontracti part dels treballs haur\u00e0 d&#8217;exercir directament les <strong>facultats d&#8217;organitzaci\u00f3 i direcci\u00f3<\/strong> sobre la feina desenvolupada pels seus treballadors a l&#8217;obra.<\/li>\n\n\n\n<li>Les empreses que vulguin intervenir en el proc\u00e9s de subcontractaci\u00f3 s&#8217;han de presentar al <strong>Registre d&#8217;Empreses Acreditades (REA)<\/strong><\/li>\n\n\n\n<li>Els contractes per realitzar activitats que <strong>no comporten l&#8217;execuci\u00f3 de cap treball a l&#8217;obra<\/strong> , no estan afectats per la llei de subcontractaci\u00f3 (per exemple, quan nom\u00e9s se <strong>subministra material a l&#8217;obra<\/strong> )<\/li>\n\n\n\n<li>Com a norma general, la normativa permet un <strong>m\u00e0xim de tres subcontractacions successives<\/strong> . L&#8217;ampliaci\u00f3 del nivell addicional de subcontractaci\u00f3, en qualsevol d&#8217;aquests sup\u00f2sits, requereix l&#8217;aprovaci\u00f3 pr\u00e8via de la direcci\u00f3 facultativa. La direcci\u00f3 facultativa no \u00e9s una figura obligat\u00f2ria a les obres sense projecte, per la qual cosa s&#8217;ent\u00e9n que <strong>aquesta excepci\u00f3 no s&#8217;ha d&#8217;aplicar<\/strong> en cap cas a les obres menors.  <\/li>\n\n\n\n<li>Cada contractista t\u00e9 l&#8217;obligaci\u00f3 de disposar d&#8217;un <strong>llibre de subcontractaci\u00f3<\/strong> , habilitat per l&#8217;autoritat laboral competent del lloc on s&#8217;executi l&#8217;obra, on quedar\u00e0 reflectida tota la informaci\u00f3 relativa a la subcontractaci\u00f3.<\/li>\n\n\n\n<li>En cas que un <strong>cap de fam\u00edlia<\/strong> , com a promotor, contracti la construcci\u00f3 o reparaci\u00f3 del seu habitatge amb treballadors aut\u00f2noms, no tindr\u00e0 la consideraci\u00f3 de contractista. Per tant, aquest cap de fam\u00edlia no estar\u00e0 obligat a disposar del llibre de subcontractaci\u00f3. <\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\"><strong>L\u00edmits a la subcontractaci\u00f3<\/strong><\/h2>\n\n<p>Igual que a les obres amb projecte els contractistes intensius o aut\u00f2noms:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>No podr\u00e0 subcontractar<\/strong> aquella empresa l&#8217;organitzaci\u00f3 productiva de la qual posada en \u00fas en obra consisteixi fonamentalment en l&#8217; <strong>aportaci\u00f3 de m\u00e0 d&#8217;obra<\/strong><\/li>\n\n\n\n<li>Un <strong>treballador aut\u00f2nom<\/strong> subcontractat <strong>no podr\u00e0 subcontractar<\/strong> els treballs a ell contractats ni a una altra empresa ni a un altre aut\u00f2nom.<\/li>\n<\/ul>\n\n<p>Igual que a les obres amb projecte, els contractistes perqu\u00e8 puguin intervenir en el proc\u00e9s de subcontractaci\u00f3, han de complir una s\u00e8rie de requisits:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Comptar amb una <strong>organitzaci\u00f3 productiva pr\u00f2pia<\/strong> , amb mitjans materials i personals necessaris i utilitzar-los per al desenvolupament de lactivitat contractada.<\/li>\n\n\n\n<li>Assumir els riscos, les obligacions i les responsabilitats pr\u00f2pies de l&#8217;activitat, i exercir directament les <strong>facultats d&#8217;organitzaci\u00f3 i direcci\u00f3<\/strong> sobre la feina dels seus treballadors.<\/li>\n\n\n\n<li><strong>Acreditar que disposen de recursos humans<\/strong> , en el nivell directiu i productiu, que compten amb la formaci\u00f3 necess\u00e0ria en prevenci\u00f3 de riscos laborals, aix\u00ed com d&#8217;una organitzaci\u00f3 preventiva adequada.<\/li>\n\n\n\n<li>Estar inscrites al <strong>Registre d&#8217;Empreses Acreditades<\/strong> , comptar amb un nombre de treballadors indefinits no inferior al 30% i disposar d&#8217;un <strong>Llibre de Subcontractaci\u00f3.<\/strong><\/li>\n\n\n\n<li><strong>Vigilar el compliment de la llei<\/strong> per part de les subcontractistes o aut\u00f2noms que contractin.<\/li>\n<\/ul>\n\n<p>En definitiva, la gesti\u00f3 preventiva en obres sense projecte exigeix \u200b\u200bel mateix rigor t\u00e8cnic i normatiu que en qualsevol altra obra, i \u00e9s responsabilitat del promotor i de les empreses intervinents garantir la seguretat, el compliment legal i la correcta coordinaci\u00f3 de tots els agents implicats.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Qu\u00e8 \u00e9s una obra de construcci\u00f3? tota obra de construcci\u00f3 ha de tenir projecte? Si no teniu projecte, no teniu direcci\u00f3 facultativa, per\u00f2 heu de tenir coordinador de seguretat? Aquests s\u00f3n alguns dels dubtes habituals que apareixen, quan l&#8217;obra no est\u00e0 definida i\/o dissenyada segons els est\u00e0ndards m\u00e9s habituals contemplats al RD1627\/97. La definici\u00f3 del [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":941,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-940","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized-ca"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gesti\u00f3 d&#039;obres sense projecte - Prodengroup<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/\" \/>\n<meta property=\"og:locale\" content=\"ca_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gesti\u00f3 d&#039;obres sense projecte - Prodengroup\" \/>\n<meta property=\"og:description\" content=\"Qu\u00e8 \u00e9s una obra de construcci\u00f3? tota obra de construcci\u00f3 ha de tenir projecte? Si no teniu projecte, no teniu direcci\u00f3 facultativa, per\u00f2 heu de tenir coordinador de seguretat? Aquests s\u00f3n alguns dels dubtes habituals que apareixen, quan l&#8217;obra no est\u00e0 definida i\/o dissenyada segons els est\u00e0ndards m\u00e9s habituals contemplats al RD1627\/97. La definici\u00f3 del [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/\" \/>\n<meta property=\"og:site_name\" content=\"Prodengroup\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-11T09:44:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-15T14:38:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"714\" \/>\n\t<meta property=\"og:image:height\" content=\"590\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Eduard Latorre\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrit per\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eduard Latorre\" \/>\n\t<meta name=\"twitter:label2\" content=\"Temps estimat de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minuts\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/\"},\"author\":{\"name\":\"Eduard Latorre\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#\\\/schema\\\/person\\\/3ad0030cb6571a4650dac782b6639ae2\"},\"headline\":\"Gesti\u00f3 d&#8217;obres sense projecte\",\"datePublished\":\"2025-09-11T09:44:25+00:00\",\"dateModified\":\"2025-09-15T14:38:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/\"},\"wordCount\":1675,\"publisher\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/gestionobra.jpg\",\"articleSection\":[\"Uncategorized @ca\"],\"inLanguage\":\"ca\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/\",\"name\":\"Gesti\u00f3 d'obres sense projecte - Prodengroup\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/gestionobra.jpg\",\"datePublished\":\"2025-09-11T09:44:25+00:00\",\"dateModified\":\"2025-09-15T14:38:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#breadcrumb\"},\"inLanguage\":\"ca\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ca\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#primaryimage\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/gestionobra.jpg\",\"contentUrl\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/gestionobra.jpg\",\"width\":714,\"height\":590},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/gestio-dobres-sense-projecte\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inici\",\"item\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/inici\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gesti\u00f3 d&#8217;obres sense projecte\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#website\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/\",\"name\":\"Prodengroup\",\"description\":\"Entornos seguros y sostenibles para empresas y personas\",\"publisher\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ca\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#organization\",\"name\":\"Prodengroup\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ca\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/proden_group_logo_color.png\",\"contentUrl\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/proden_group_logo_color.png\",\"width\":720,\"height\":139,\"caption\":\"Prodengroup\"},\"image\":{\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/proden-group\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/#\\\/schema\\\/person\\\/3ad0030cb6571a4650dac782b6639ae2\",\"name\":\"Eduard Latorre\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ca\",\"@id\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/EduardLatorre-150x150.jpg\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/EduardLatorre-150x150.jpg\",\"contentUrl\":\"https:\\\/\\\/prodengroup.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/EduardLatorre-150x150.jpg\",\"caption\":\"Eduard Latorre\"},\"description\":\"Ingeniero T\u00e9cnico en Industrias Agroalimentarias Coordinador de seguridad y salud\",\"url\":\"https:\\\/\\\/prodengroup.com\\\/ca\\\/author\\\/eudardlatorre\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gesti\u00f3 d'obres sense projecte - Prodengroup","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/","og_locale":"ca_ES","og_type":"article","og_title":"Gesti\u00f3 d'obres sense projecte - Prodengroup","og_description":"Qu\u00e8 \u00e9s una obra de construcci\u00f3? tota obra de construcci\u00f3 ha de tenir projecte? Si no teniu projecte, no teniu direcci\u00f3 facultativa, per\u00f2 heu de tenir coordinador de seguretat? Aquests s\u00f3n alguns dels dubtes habituals que apareixen, quan l&#8217;obra no est\u00e0 definida i\/o dissenyada segons els est\u00e0ndards m\u00e9s habituals contemplats al RD1627\/97. La definici\u00f3 del [&hellip;]","og_url":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/","og_site_name":"Prodengroup","article_published_time":"2025-09-11T09:44:25+00:00","article_modified_time":"2025-09-15T14:38:49+00:00","og_image":[{"width":714,"height":590,"url":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg","type":"image\/jpeg"}],"author":"Eduard Latorre","twitter_card":"summary_large_image","twitter_misc":{"Escrit per":"Eduard Latorre","Temps estimat de lectura":"8 minuts"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#article","isPartOf":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/"},"author":{"name":"Eduard Latorre","@id":"https:\/\/prodengroup.com\/ca\/#\/schema\/person\/3ad0030cb6571a4650dac782b6639ae2"},"headline":"Gesti\u00f3 d&#8217;obres sense projecte","datePublished":"2025-09-11T09:44:25+00:00","dateModified":"2025-09-15T14:38:49+00:00","mainEntityOfPage":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/"},"wordCount":1675,"publisher":{"@id":"https:\/\/prodengroup.com\/ca\/#organization"},"image":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#primaryimage"},"thumbnailUrl":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg","articleSection":["Uncategorized @ca"],"inLanguage":"ca"},{"@type":"WebPage","@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/","url":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/","name":"Gesti\u00f3 d'obres sense projecte - Prodengroup","isPartOf":{"@id":"https:\/\/prodengroup.com\/ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#primaryimage"},"image":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#primaryimage"},"thumbnailUrl":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg","datePublished":"2025-09-11T09:44:25+00:00","dateModified":"2025-09-15T14:38:49+00:00","breadcrumb":{"@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#breadcrumb"},"inLanguage":"ca","potentialAction":[{"@type":"ReadAction","target":["https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/"]}]},{"@type":"ImageObject","inLanguage":"ca","@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#primaryimage","url":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg","contentUrl":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/gestionobra.jpg","width":714,"height":590},{"@type":"BreadcrumbList","@id":"https:\/\/prodengroup.com\/ca\/gestio-dobres-sense-projecte\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inici","item":"https:\/\/prodengroup.com\/ca\/inici\/"},{"@type":"ListItem","position":2,"name":"Gesti\u00f3 d&#8217;obres sense projecte"}]},{"@type":"WebSite","@id":"https:\/\/prodengroup.com\/ca\/#website","url":"https:\/\/prodengroup.com\/ca\/","name":"Prodengroup","description":"Entornos seguros y sostenibles para empresas y personas","publisher":{"@id":"https:\/\/prodengroup.com\/ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/prodengroup.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ca"},{"@type":"Organization","@id":"https:\/\/prodengroup.com\/ca\/#organization","name":"Prodengroup","url":"https:\/\/prodengroup.com\/ca\/","logo":{"@type":"ImageObject","inLanguage":"ca","@id":"https:\/\/prodengroup.com\/ca\/#\/schema\/logo\/image\/","url":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/07\/proden_group_logo_color.png","contentUrl":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/07\/proden_group_logo_color.png","width":720,"height":139,"caption":"Prodengroup"},"image":{"@id":"https:\/\/prodengroup.com\/ca\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/proden-group"]},{"@type":"Person","@id":"https:\/\/prodengroup.com\/ca\/#\/schema\/person\/3ad0030cb6571a4650dac782b6639ae2","name":"Eduard Latorre","image":{"@type":"ImageObject","inLanguage":"ca","@id":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/EduardLatorre-150x150.jpg","url":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/EduardLatorre-150x150.jpg","contentUrl":"https:\/\/prodengroup.com\/wp-content\/uploads\/2025\/09\/EduardLatorre-150x150.jpg","caption":"Eduard Latorre"},"description":"Ingeniero T\u00e9cnico en Industrias Agroalimentarias Coordinador de seguridad y salud","url":"https:\/\/prodengroup.com\/ca\/author\/eudardlatorre\/"}]}},"_links":{"self":[{"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/posts\/940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/comments?post=940"}],"version-history":[{"count":1,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/posts\/940\/revisions"}],"predecessor-version":[{"id":942,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/posts\/940\/revisions\/942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/media\/941"}],"wp:attachment":[{"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/media?parent=940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/categories?post=940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prodengroup.com\/ca\/wp-json\/wp\/v2\/tags?post=940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}