FAT for multilevel industrial equipment safety in an international environment

International FAT, outsourcing

A multilevel industrial equipment safety FAT project was developed in an international environment, focused on the technical validation of a process system prior to its shipment to the plant. The work was carried out from the ENGINEERING area of PRODEN GROUP, at the manufacturer’s facilities in Italy, with coordination in English between customer, supplier and […]

LOTO training in the construction materials sector

LoTo training in the building materials sector

PRODEN GROUP Academy developed a LoTo training project in the construction materials sector for an industrial plant in the province of Tarragona. This training action was also the final phase in the process of implementing the LoTo methodology in the plant, reinforcing previously defined technical and organizational criteria. Therefore, training was considered a key element […]

Internal traffic safety in industrial facilities

Pedestrian crossing safety

Proden Group has successfully executed an internal traffic safety project in an industrial facility characterized by particularly harsh and demanding conditions. Spaces characterized by adverse conditions, high load movement, blind spots and poor visibility, as well as intense movement of people, vehicles and goods.The main objective has been to protect workers and optimize the safe […]

FAT Glass melting furnace

The overall project involves the installation of a glass melting furnace at an important industrial customer in Spain in the building materials sector. Within this process, the Factory Acceptance Test (FAT) performed in Germany is a key milestone that ensures the technical feasibility, safety and quality of the future installation. The FAT represents much more […]