Project to bring a lifting table into conformity according to RD 1215/1997.

Adequacy of lifting platform RD1215

PRODEN GROUP has developed a project for the compliance of a lifting table according to RD 1215/1997 in a company of the automotive sector located in Sabadell. The project was approached from the following areas ENGINEERING and later ADEQUAensuring a technical approach, progressive and aligned with current regulations. In addition, the compliance of the lifting […]

Biochipper adaptation project according to RD 1215/1997.

Adaptation to RD1215 machinery

PRODEN GROUP has developed a project for the adaptation of a bio shredder according to RD 1215/1997 in Vic, integrating safety engineering and technical actions provided. The project was approached from the following areas ENGINEERING and later ADEQUAensuring technical consistency and regulatory compliance throughout the process. In addition, the adequacy of the biochipper according to […]

Engineering project for low voltage electrical revision and grounding revision.

Low voltage revision

PRODEN GROUP has developed an electrical engineering project for a low voltage electrical revision in an industrial installation. The action was carried out in an industrial installation, located in the province of Barcelona.The action consisted of a preventive electrical inspection of the installation and the grounding system. With the aim of verifying its condition, continuity […]

Meat machinery safety: adaptation RD 1215/1997 and ISO 13849

Evaluation and adaptation of the meat plant

In this case study we present the engineering and industrial safety project according to ISO 12100 and RD 1215 developed by PRODENGROUP in a meat plant in the province of Girona, specializing in the production of fresh meat products and sausages. The objective was to adapt an industrial grinder and its associated elevator to Royal […]

Risk Assessment in Wastewater Treatment Plant -Preventive Engineering

Context of the project One of Spain’s leading manufacturers of recycled paper requested the collaboration of PRODEN Group to carry out a safety and risk assessment study in the design phase of a new wastewater treatment plant, located in its industrial complex in Lleida. The project was part of the expansion of its water treatment […]

Flour Production Line Risk Assessment – Preventive Engineering

Evaluación de diseños 3D mediante aplicación de RD1215

Context of the project The study of machine safety is framed within the philosophy of preventive engineering PRODEN’s preventive engineering philosophy, aimed at integrating safety from the early stages of industrial machinery design. An industrial machinery manufacturer requested the collaboration of PRODEN Group to carry out a complete safety study in the design phase of […]

Internal traffic safety in industrial facilities

Pedestrian crossing safety

Proden Group has successfully executed an internal traffic safety project in an industrial facility characterized by particularly harsh and demanding conditions. Spaces characterized by adverse conditions, high load movement, blind spots and poor visibility, as well as intense movement of people, vehicles and goods.The main objective has been to protect workers and optimize the safe […]

Integral evaluation and adequacy of presses according to RD 1215/1997

Targeta Proden comprehensive evaluation

PRODEN GROUP has developed a comprehensive process of evaluation, design and validation of safety improvements on 8 stamping presses, located near Barcelona, in order to ensure legal compliance according to Royal Decree 1215 and the main international standards applicable to industrial equipment. The duration of this project has been 2 years, due to the critical […]

Adequacy and CE certification of semi-automatic baler: “Zero Access”.

Security

Adaptation of a semi-automatic baler to “Zero Access” safety requirements and CE recertification. In Prodengroup we have carried out a project of risk assessment and machine safety adequacy in a semi-automatic baler, in order to ensure compliance with the principles of “Zero Access” and CE recertification of the equipment, thus ensuring its compliance with current […]